Our Projects
Discover our portfolio of successful construction and engineering projects that showcase our expertise and commitment to excellence.

Water Pipeline Albanik-Podujevë
2012This project involves the replacement of an existing water transmission pipeline along the Albanik–Podujevë section. The scope covers the installation of a new PE (Polyethylene) pipeline with an outside diameter of 400 mm, designed to operate at PN 16 bar, ensuring improved durability, hydraulic performance, and long-term service reliability. The total length of the pipeline to be replaced is 2,000 meters, including all associated civil, mechanical, and installation works required to integrate the new system into the existing water supply network.

Construction of the Water Supply Network
2010This project focuses on the construction and expansion of the water supply network for the villages of Vlashnje and Atmaxh in the Prizren region. The works include the installation of a comprehensive polyethylene (PE) pipeline system designed to provide reliable and long-term water supply services to the local population. The project involves the installation of PE pipes ranging from OD 25 mm to OD 315 mm, with a total pipeline length of approximately 32,000 meters, including all required fittings, valves, and household service connections.

Heating Distribution Network
2018The project involved the rehabilitation of the district heating network in the city of Prishtina, as well as the construction of the substations. DCS Consult Eng carried out the construction of the new distribution network and supervised the substations during the construction phase.

Rehabilitation of the Trepça Hangar
2022Rehabilitation of the Trepça Hangar – Collection Point for Refractory Materials from Balkan Countries.

Rehabilitation of District Steam Heating System
2018Supervision of the cogeneration project during the construction phase of the District Heating system, utilizing steam from the turbines of Kosovo B, as well as the construction of the two substations HES and HRS, and the rehabilitation of the distribution network and the main supply line. DCS completed part of the water and sewage works at the KEK HES substation. The project was financed by the German Development Bank KfW and other stakeholders, with a total value of approximately EUR 37 million. The project has significantly reduced air pollution by eliminating the use of heavy fuel oil previously burned by the Termokos heating company.

Sports Complex
2022Multi-purpose sports facility with Olympic-standard swimming pool and indoor courts.